Redman Plaza, Plant City
9,000 SF strip plaza on approximately 1/4 acre site. Stormwater was accommodated by the installation of an underground stormwater detention system.
9,000 SF strip plaza on approximately 1/4 acre site. Stormwater was accommodated by the installation of an underground stormwater detention system.
Site development with the addition of an additional structure on developed site. Site constraints included existing structures and finished floors, wetland, and tractor-trailer access.
Dade City - Prototype facility without machine shop. Small site with significant fall in the existing conditions. Modified the existing drainage facility to accommodate the additional facility.
Ocala - Prototype facility with machine shop facilities located on a site within a closed drainage basin with high ground water and non-desirable soils. Located along State highway.
Site required rezoning of additional parcel to allow for the development. Maximized improvements on site with minimal stormwater requirements. Permitted through South Florida Water Management.
Site development with outparcel on the previous site of an abandoned K-Mart facility. Included master stormwater plan and an expedited design and permitting process.
Site redevelopment of existing site to provide new access for delivery trucks, additional parking, enhanced landscaping and revised drainage.
Existing site had approximately nine feet of fall across the area where the building is now placed. Significant fill was brought in to allow development. Retaining wall permitted.