Mosaic Raw Water Main

Mosaic Raw Water Main

Project included a four and one half mile replacement of a 20” steel raw water main that was installed in the 1950’s. The steel line was continuing to develop leaks that posed a risk to continued operations.

Legacy Church – Auburndale

Legacy Church – Auburndale

Site development for a 400 seat facility with accommodations for future development.

Tri-County Baptist Church

Tri-County Baptist Church

Site design for a 400 seat sanctuary with design including future development.

Planning a similar project?

Tell us about your site and we’ll help you find the path of least resistance through the permitting process. Call 813-747-9100 or email info@boggseng.com.

Contact Us